Wenzhou Business Consultancy Gropu (WBCG)

 

Since 2017 the WKU WBCG has worked with over a dozen businesses in the Wenzhou area to provide consulting and business support services including data gathering and analysis.

 

The Mission of the WBCG is to connect with local businesses, to assist and support them, to add value, and to interconnect with the community by supporting and encouraging business transformation, economic growth, and development in the greater Wenzhou area.

 

 

 

 

 

 

 

 

 

 

===========

First archive: Oct. 26, 2020

Posted by Jeonghwan Choi

댓글을 달아 주세요

Open Education Resources (OER) is a category of educational materials available in the public domain that is available with little or no-cost access, and with zero or limited restrictions in terms of usability repurposing and redistribution.

libguides.kean.edu/OER

Kean OER Homepage

 

Research Guides: OER: What is OER?

Open and Affordable Educational Resources we will help you embrace OER

libguides.kean.edu

 

 

In May 2020, WKU CBPM started engaging in the OER initiative along with the Kean USA.

 

May 09, 2020, CBPM Faculty members suggested Free e-textbooks for these courses and  classes. 

In May 10,  WKU CBPM Dean CJ approved those OER suggestions. 

 

docs.google.com/spreadsheets/d/1Oyoh7FdGSpJfzus9NXhif-cS31fgJAytOzSIKF6pnLc/edit?usp=sharing

 

Google 스프레드시트 - 스프레드시트를 작성하고 수정할 수 있으며 무료입니다.

하나의 계정으로 모든 Google 서비스를 스프레드시트로 이동하려면 로그인하세요.

accounts.google.com

2020. Nov. 05: Encouraging WKU CBPM MGM Faculty Members OER (Free ebook) adoption (Email, Nov. 05, 2020). 

 

2020 Winter / Spring OER Book Choices

 

https://docs.google.com/spreadsheets/d/1Oyoh7FdGSpJfzus9NXhif-cS31fgJAytOzSIKF6pnLc/edit?usp=sharing

 

===============

2020. Nov. 05: Added encouragement of adopting the OER (email). 

2020. Oct. 13, Initially created this document. 

 

Posted by Jeonghwan Choi

댓글을 달아 주세요

2020 WKU CBPM Building Operational Improvement

CBPM has a nice building to provide world-class education. But it needs to get improved continually in operation. Social Media Lab, 2nd Floor Outdoor space, and the North side of the building can provide operational excellency if we can improve it slightly. 

 

Social Media Lab is to create world-class business educational contents. But it has risks of fire and health for poor indoor materials.

 

2nd-floor outdoor space can be extended as a part of “Business Research and Innovation Center (BRIC)” where it can provide “Business events such as Business speech; business gatherings, invite talks; Quartet, and small performance. This space can provide the chance to build a business network with the Wenzhou business community (This space can host 500 persons).

 

North side of the building (adjacent to the large indoor Auditorium) can be used as the “Outdoor Theater” as it was designed for if we can add solar panel and stage. This space can host a medium-size school event such as freshman welcoming or graduation ceremony (This space can host 1,000 persons). 

 

Suspended the Social Media Lab improvement for a while (Jan. 2021) for Budget problem. 

 

Dec. 08, 2020:

The Social Media Lab Improvement plan is suspended because a resolution was not achieved between Social Media Director and Logistics Department. The space will remain the same as it is.  But "Risk of Fire" will be continually addressed. 

 

 

Adding to the improvement, a Cafe facility can be installed in the 2nd floor. (2020. Jan. 14)

 

 

 

 

 

5. College of Business - Management, Global Business, and Marketing Banner Installed on the 2nd Floor spaces (Oct. 24, 2020)

 

6. Jan. 2021: Equipped "First Aids Package" and "WheelChair" for Medical Emergency Situation at the 2nd floor of CBPM building.

Dr. Jerry Choi coined the idea and donated the Medical Aid box and wheelchair. 

Dr. Margaret Chen suggested first aid medicines and materials. 

Dr. Candy Chiu suggested Wheelchair. 

 

 


 

Feb. 23, 2021: Suggestion of CBPM Building's Operational Adjustment with the New Campus Buildings.

 

New Campus Building: Architect (started operation in Feb. 2021). 

You may know that WKU CBPM has around 60% student body size, and we have served many external operations in cooperating with the school's demand. 

And it's time to adjust the school space operational adjustment with the new campus building. 

 

Originally, CBPM had "Library" space and "Project Rooms" space on the first floor of our building. 

 

But those spaces are used for 'Exhibition Room' and some strange outside activities, not for CBPM purposes as below. 

 

 

"Could we talk and negotiate to make operational adjustments of CBPM building with new campus buildings?". 

 

One thing is clear for us, CBPM needs more space to manage 'larger numbers of CBPM students' day by day. 

 

And we wish we can make excellent 'operations' of each campus building continually. 

Please kindly consider this suggestion, and please feel free to contact us to talk about 'Operational Adjustment'. 

 

 

 

 

 

 

 

================

2021. 02. 23: Suggestion of CBPM Building Operational Adjustment with New Campus Buildings (to Logistics Department). 

2021. 01. 25: Moved the Virtual conference room information to Social Media Lab website. 

 

2021. 01. 14: Equipped Video Camcoder and Camera at Virtual Conference room (B-208)

2021. 01. 13: Completed First Aids equipment. 

2020. 12. 08: Social Media Lab Improvement Plan is Suspended. 

2020. 10. 24: Revised plans 

2020. 10. 04; First created by DR. Jerry Choi

 

Posted by Jeonghwan Choi

댓글을 달아 주세요